The Platform Timeline

Chronos maintains the canonical timeline of the Liana Banyan Platform — not as a marketing document, but as an empirical record. Every entry is time-anchored and carries an Eyewitness agreement score.

Era Overview

EraPeriodCanonical Focus
Foundation1989–2010Core cooperative design principles established
Architecture2011–2020System architecture, legal structure, cooperative economics
Build2021–2025Technical implementation, patent filing, platform construction
Launch2026Public cooperative launch, Red Carpet, Member onboarding

Rope of History — Knots at Events

The platform’s history is best visualized as a rope along which knots are tied at each substrate event: every Pheromone fired, every Eblet minted, every canon ratified, every innovation moment captured. Knot spacing reflects innovation density — sparse for steady incremental work, tight clusters for high-density sessions where a single prompt thought cascades into many components. See the Rope of History page for the BP053→BP058 arc knot cluster.

Canonical Milestones (High-Confidence)

BP053→BP058 Arc · Sound Barrier and Beyond (2026-05-22 → 2026-05-26)

2026-05-26 — BP058 W15 BLACK MAMBA candidate

  • W6 18-min wave · W6.5 chart-modal · W7 Pawn inventory · W11-E charts
  • WHOMPER 44-min · 128 files
  • ESCAPE VELOCITY 90-min · 250+ deliverables · 90 honest composite
  • 4 BLOOD-class half-dreaming anchors (People-Are-Substrate · Smart/Poor + Modern Musketeers · 3 NEW Programs · Caithedral lean)
  • 5 Speckle-class canonical primitives (Speckle · Hex-Soccerball · Peanut-Roll · Mass-Crystal · AI Tuner)
  • Computation-knowledge separation doctrine locked
  • Eyewitness score: in-flight ✅

2026-05-25 — BP057 W5b/W5c · Prov 20 v2 USPTO Filed

  • W5a single-thread ceiling discovery (ceiling-is-data-not-failure pedagogy)
  • W5b RETRY GOLD multi-channel · cooperative-class fix
  • W5c Path A 4-Knight concurrent
  • Prov 20 v2 USPTO Application 64/073,890 FILED 2026-05-25 05:33 ET
  • 60% Cursor spend reduction empirical · 95% throttling-class claim
  • “Cooperative-Class Substrate Is the Real Economics” article title locked
  • 3,840 SAGA W5 GOLD geometric target (60·120·240·960·3840)
  • Eyewitness score: 0.95+ ✅

2026-05-24 — BP056B Wrasse-Quartermaster Birth · Caithedral Core Rename

  • Wrasse-Quartermaster substrate primitive born · Layer A.1 SHIPPED
  • Pearl Prerogative coinage (Founder direct: emit Pearls not full Eblet quotes)
  • Caithedral Core canonical rename (formerly CAI Core)
  • 960-Goliath W4 launch · sub-mark Broadcast Scheduler
  • E&A (Extract and Asteroid-Proof Vault) terminology supersedes E&V
  • BOM-before-shebang Node ESM gotcha · gadget-first discipline RECURRENCE-FLAGGED
  • Eyewitness score: 0.93 ✅

2026-05-23 — BP055 W3/W4 960-Goliath · Sound Barrier Crossed

  • W3 + W4 960-Goliath wave · sub-mark Broadcast Scheduler
  • Founder direct: “I think I broke the Sound Barrier”
  • 1067× wall-clock compression empirical
  • Stratospheric Benchmark dashboard LIVE on cephas-hugo download
  • Knight Banyan Metric™ 87/100
  • Eyewitness score: 0.94 ✅

2026-05-22 — BP054 Employ-the-World Canon · Cold Start Kaleidoscope

  • BP044-class Business Proposals · Employ-the-World canon (Members retain 100% IP · LB Cost+20% · Researcher tiers · Ox’s Share)
  • Cold Start kaleidoscope merry-go-round (12 Bounty classes)
  • Marion Barry Market discovery (4 Crown candidates · canonical first-Phoebe-save)
  • Local Civic Eblet Project (Lewistown MT first locality)
  • 5 Founder LoC academic papers submission-ready
  • Library-of-Congress 10K-node pitch · “Proof to the People”
  • Eyewitness score: 0.93 ✅

2026-05-22 — BP053 Eyewitness Benchmark · Stratospheric Class · Sound Barrier First Crossing

  • 935 replicates · 8 models · Haiku-Opus 0.883 “almost perfect agreement”
  • Cathedral-runs-on-Haiku empirical receipt
  • Stratospheric class (first crossing of the Sound Barrier)
  • Eyewitness Benchmark canonical
  • Fix-as-we-go meta-immutable (BP053)
  • Eyewitness score: 0.96 ✅

Earlier Canonical Milestones

2026-05-25 — Patent Session BP056B

  • Provisional application 20 filed (App #64/073,890)
  • Total: 21 provisional applications filed
  • Formal claims: ~2,473 across 21 provisionals
  • Prov 21 filed (updated BP073 2026-06-04)

2026-05-11 — Patent Session BP036

  • Provisional applications 18 + 19 filed
  • Total: 19 provisional applications filed
  • Formal claims: ~2,506 across 17 provisionals (18+19 pending counsel audit)
  • Eyewitness score: 0.95+ ✅

2026-05-07 — Patent Session BP035

  • Provisional applications 16 + 17 filed
  • R-CONTEXT-UPSTREAM Trinity Rule bound (QUINDECIM #13)
  • R-SEARCH-EXHAUSTIVE Trinity Rule bound (QUINDECIM #14)
  • Eyewitness score: 0.95+ ✅

2026-04-20 — AGENTS.md B111

  • Universal Agent Instructions issued
  • Applies to all AI agents in workspace
  • Founder-ratified
  • Eyewitness score: 1.0 ✅ (canonical document)

2026-04-23 — K461/B121

  • KNIGHT_QUEUE.md Phase 2 LIVE
  • Cathedral-derived rendering activated
  • Eyewitness score: 0.92 ✅

Query the Full Timeline

Use the Chronos query interface to explore the full timeline:

GET /chronos/timeline?from=1989-01-01&to=2026-05-25&confidence=high

Or browse by initiative:

GET /chronos/timeline?initiative=VSL&confidence=all

Contributing to the Timeline

Members who discover historical artifacts — documents, dates, decisions — not yet in the substrate may submit them for Chronos ingest.

Requirements for a valid contribution:

  1. Canonical reference (or create one)
  2. Timestamp (exact or estimated, clearly labeled)
  3. Source (where the artifact comes from)
  4. Two Member witnesses (or one CANON document reference)

Accepted contributions earn Marks and a substrate receipt.


The Liana Banyan Platform has a 37-year history. Chronos is where you can verify it.